Excellent E-S4CON-2505 Updated 2025 Dumps With 100% Exam Passing Guarantee [Q19-Q40]

Share

Excellent E-S4CON-2505 Updated 2025 Dumps With 100% Exam Passing Guarantee

Best way to practice test for SAP E-S4CON-2505

NEW QUESTION # 19
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A.
  • B.
  • C.
  • D.
  • E.

Answer: B,C,D


NEW QUESTION # 20
Which orchestration tool facilitates a move to SAP cloud by wrapping different scenarios such as Lift&Shift or system conversion to SAP S/4HANA?

  • A. SAP migration cockpit
  • B. RISE with SAP system transition workbench
  • C. Software Orchestrator
  • D. SAP Business Transformation Center

Answer: B


NEW QUESTION # 21
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. SUM is still running in uptime; the 40 defined R3load processes are considered.
  • B. Without table contents comparison, only 40 R3load processes are being started.
  • C. These are 40 pairs of R3load processes, so there are 80 R3load processes running
  • D. There are 40 R3load processes used for copying and 40 R3load processes for table count verification.

Answer: C


NEW QUESTION # 22
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

  • A. EU_CLONE MIG SOT RUN
  • B. EU IMPORT ALL
  • C. EU_CLONE MIG_DT_CREATTE
  • D. EU CLONE MIG_DT_RUN

Answer: D


NEW QUESTION # 23
Which preoperational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
  • B. Install add-on SAP Gateway 7.50.
  • C. Perform the custom code adjustment.
  • D. Delete client 066 (Early-Watch client).

Answer: A,D


NEW QUESTION # 24
You are performing an SAP S/4HANA conversion, scenario strategy Standard, with DMOO as an in place migration. How does SUM transfer the data from the source database to the target database during the migration?

  • A. Using work processes and network socket connection
  • B. Using R3load and memory pipes
  • C. Using R3load and network socket connection
  • D. Using R3load and file transfer

Answer: B


NEW QUESTION # 25
When using the DMO of SUM, which files can be handled by SUM in the download directory? Note:
There are 2 correct answers to this question.

  • A. Breakpoint configuration file SAPUPPHAS.BRK
  • B. Stack XML file calculated by the maintenance planner
  • C. Parameter file SAPup_add.par
  • D. MIGRATE_DT_DUR.XML file from a previous run

Answer: B,D


NEW QUESTION # 26
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Unicode conversion
  • B. Database migration
  • C. Custom code analysis
  • D. Software update

Answer: B,D


NEW QUESTION # 27
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. The Si checks are executed in the development system and the results are transported into the subsequent systems.
  • B. You need to build up an SI check framework by applying SAP Notes.
  • C. You need an SAP system based on AS ABAP 7.52 or above for the SI check framework.
  • D. The errors from the SI checks must be solved; otherwise, SUM will report an error.

Answer: B,D


NEW QUESTION # 28
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP Solution Manager 7.2
  • B. SAP ECC system from SAP ERP 6.0 EHP 8
  • C. SAP S/4HANA Server 2022
  • D. Standalone AS ABAP with SAP BASIS 752

Answer: C,D


NEW QUESTION # 29
You have selected "Standard" as scenario strategy in the SUM tool.
Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.

  • A. Activation of dictionary objects (ACT_UPG)
  • B. Modification adjustment (SPAU)
  • C. Conversion of application tables (PARCONV_UPG)
  • D. Modification adjustment (SPDD)

Answer: A,D


NEW QUESTION # 30
During a SUM run, you want to check if the PARCONV_UPG phase is still running property. Where can you find information about this? Note: There are 2 correct answers to this question.

  • A. Check the latest log files in the SUM directory, subdirectory a bap, subdirectory tmp.
  • B. Check for running R3trans processes on the host where SUM is running
  • C. Check the running batch job via Job Overview (SM37).
  • D. Check for running R3load processes on the host where SUM is running

Answer: A,C


NEW QUESTION # 31
You performed a custom code check for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.

  • A. ATC (ABAP Test Cockpit)
  • B. SYCM (Simplification Database Content)
  • C. SE80 (Object Navigator)
  • D. SAT(Runtime Analysis)

Answer: A,C


NEW QUESTION # 32
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.

  • A. You can find the optimal number of parallel R3load processes by monitoring host performance.
  • B. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.
  • C. You can record the modification adjustment during migration and use the transports in the next runs.
  • D. You can verify that the content of the download directory matches the stack XMML file.

Answer: A,B


NEW QUESTION # 33
You want to perform an SAP S/4HANA conversion using SUM with in place DMO.
Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correct answers to this question.

  • A. Activation of dictionary objects in phase ACT_UPG
  • B. Creation of application tables in the SAP HANA database in phase
  • C. Import of upgrade and language data from the download directory in phase TAABIM UPG
  • D. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB
  • E. Import of dictionary objects from the download directory in phase DDIC_UPG

Answer: A,C,E


NEW QUESTION # 34
You are performing an in place SAP S/4HANA conversion including DMO.
What is the latest point in time when you can reset the procedure without losing business data?

  • A. The start of the Execution roadmap step
  • B. The end of the business downtime
  • C. The end of the database migration
  • D. The start of the business downtime

Answer: B


NEW QUESTION # 35
......

SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade Certification Sample Questions and Practice Exam: https://testinsides.actualpdf.com/E-S4CON-2505-real-questions.html